Cause all that matters here is passing the APICS CPIM-BSP exam. Cause all that you need is a high score of CPIM-BSP CPIM - Basics of Supply Chain Management exam. The only one thing you need to do is downloading Examcollection CPIM-BSP exam study guides now. We will not let you down with our money-back guarantee.

APICS CPIM-BSP Free Dumps Questions Online, Read and Test Now.

NEW QUESTION 1

Which of the following tools is considered to be one of the seven quality tools?

  • A. Gantt chart
  • B. Input/output chart
  • C. Control chart
  • D. Capacity chart

Answer: C

NEW QUESTION 2

Which of the following factors can negatively influence indirect costs such as production planning, purchasing, and inventory management?

  • A. Standardized parts
  • B. Low efficiency production equipment
  • C. Poor product design
  • D. Time to market

Answer: C

NEW QUESTION 3

Which of the following factors would reduce inventory carrying costs?

  • A. Ordering less inventory
  • B. Higher costs of working capital
  • C. Reducing ordering costs
  • D. Reducing transportation costs

Answer: A

NEW QUESTION 4

The principal objective of total quality management in manufacturing is to:

  • A. implement statistical process control.
  • B. meet the expectations of the customer.
  • C. reduce the costs of failure.
  • D. eliminate inspections.

Answer: B

NEW QUESTION 5

Production activity control receives authorization to release work orders from:

  • A. the material requirements plan.
  • B. the master production schedule.
  • C. production planning.
  • D. input/output control.

Answer: A

NEW QUESTION 6

Which of the following documents or records typically is required by accounting, receiving, purchasing, and the supplier?

  • A. Bill of lading
  • B. Purchase requisition
  • C. Receiving report
  • D. Purchase order

Answer: D

NEW QUESTION 7

Earliest job due date is an example of:

  • A. dispatching.
  • B. infinite scheduling.
  • C. a chase strategy.
  • D. available-to-promise.

Answer: A

NEW QUESTION 8

The question below is based on the following illustration of product parts:
CPIM-BSP dumps exhibit
Which of the following items are components?

  • A. Y and Z only
  • B. 1, 2, and 3 only
  • C. Y, Z, 1, 2, and 3 only
  • D. X, Y, Z, 1, 2, and 3

Answer: C

NEW QUESTION 9

Which of the following processes converts the master production schedule into resource requirements that are then compared to the available resources?

  • A. Capacity requirements planning
  • B. Rough-cut capacity planning
  • C. Material requirements planning
  • D. Resource planning

Answer: B

NEW QUESTION 10

A product has a forecast of 200 units a month. The actual demand for the past 6 months has been 195, 210, 205, 190, 220, and 225. Calculate the tracking signal for this product's forecast.

  • A. 6
  • B. 7.5
  • C. 45
  • D. 75

Answer: A

NEW QUESTION 11

Which material handling equipment is the most flexible in a distribution center?

  • A. Industrial trucks
  • B. Conveyor
  • C. Crane
  • D. Hoist

Answer: A

NEW QUESTION 12

Which of the following terms represents a complete supply chain dedicated to the flow of products and materials for the purpose of returns, repair, remanufacture, or recycling?

  • A. Responsible landfill
  • B. Remanufacturing resource planning
  • C. Reverse logistics
  • D. Global distribution

Answer: C

NEW QUESTION 13

What is the output of sales and operations planning?

  • A. Production plan
  • B. Master production schedule
  • C. Sales plan
  • D. Production order

Answer: A

NEW QUESTION 14

Part A is made from two Y’s and one X. An order is received for 50 A’s and there are 30 A’s in stock. What is the net requirement for X?

  • A. 20
  • B. 40
  • C. 50
  • D. 100

Answer: A

NEW QUESTION 15

Which of the following actions is an example of a company expanding its customer service offering?

  • A. Adding a distribution center
  • B. Increasing work-in-process (WIP) inventory
  • C. Implementing statistical process control (SPC)
  • D. Decreasing manufacturing lot sizes

Answer: A

NEW QUESTION 16

Which plant type describes a product at one stage that can be transformed into several distinct products at the next stage (divergent points)?

  • A. A-Plant
  • B. I-Plant
  • C. T-Plant
  • D. V-Plant

Answer: D

NEW QUESTION 17

Which of the following items is a source of independent demand?

  • A. Customer orders for finished products
  • B. Subassembly requirements from material requirements planning
  • C. Raw material requirements from material requirements planning
  • D. Protective packaging for shipping customer orders

Answer: A

NEW QUESTION 18

Which of the following issues would be of greatest concern for a company choosing to reduce its finished goods inventory?

  • A. Long production changeover time
  • B. Customer service expectations
  • C. Product quality requirements
  • D. Product shelf life constraints

Answer: B

NEW QUESTION 19

Which of the following considerations is an advantage of sourcing from multiple suppliers?

  • A. Competition
  • B. Opportunity for partnering
  • C. Better quality
  • D. Shorter lead times

Answer: A

NEW QUESTION 20

Which of the following techniques typically eliminates common errors?

  • A. Practical kaizen training
  • B. Kaizen
  • C. Poka-yoke
  • D. Kanban

Answer: C

NEW QUESTION 21

Having bolts and tools at the point of use on the automobile assembly line eliminates the waste of :

  • A. waiting.
  • B. overproduction.
  • C. making defects.
  • D. stocks.

Answer: A

NEW QUESTION 22
......