Actualtests C2010-825 Questions are updated and all C2010-825 answers are verified by experts. Once you have completely prepared with our C2010-825 exam prep kits you will be ready for the real C2010-825 exam without a problem. We have Renew IBM C2010-825 dumps study guide. PASSED C2010-825 First attempt! Here What I Did.

NEW QUESTION 1
A user loaded a repository workspace that flows with the team's stream. The user can see an incoming change for the file CoreClass in the RTC client, but decides to edit this file and check in the change.
How does the Jazz SCM handle this situation?

  • A. A potential conflict is detected and the user is prevented from checking in the file CoreClass that already has an incoming change.
  • B. The conflict for the file CoreClass is detected in the incoming and outgoing change sets and the changes are automatically merged for the user.
  • C. A conflict between the incoming and outgoing change sets for the file CoreClass is detected and the conflict is shown in the pending changes view.
  • D. The incoming changes for the file CoreClass are detected and the file is automatically set to read-only, preventing the user from accidentally editing it.

Answer: D

NEW QUESTION 2
What is the source of the data to create metric based reports?

  • A. RTC REST API
  • B. CCM Database
  • C. Data Warehouse
  • D. Data Collection Component Database

Answer: B

NEW QUESTION 3
A developer using the RTC Eclipse client is viewing the history of a component. The developer would like to understand which source files were included in one of the change sets.
How could the developer accomplish this?

  • A. Review the Change Summary for the change set.
  • B. Locate change sets that affected the component.
  • C. View the change set's Open Related work items.
  • D. Export the history with the Include File Details optio

Answer: A

NEW QUESTION 4
An administrator is evaluating different templates and needs to select one for use on a new project area. Which of the following is the first consideration?

  • A. The team area to release relationship.
  • B. The number of teams in the project area.
  • C. The development process of the software team.
  • D. The geographical distribution of team member

Answer: D

NEW QUESTION 5
A manager wants to know how long work items are staying in the In Progress state. Which type of trend report will show this?

  • A. Work Item Aging
  • B. Work Item Closure
  • C. Work Item Creation
  • D. Work Item Turnaround

Answer: A

NEW QUESTION 6
A scrum master has defined an iteration plan and created several tasks for the plan. The assigned team members are updating the tasks' attributes of Status, Estimate Correction and Time Remaining in the work item editors.
How do these updates affect the plan's Work Breakdown view?

  • A. The progress bars for each team member reflect the changes.
  • B. The view shows work items organized into columns based on status.
  • C. The tasks' ranks are updated automatically to reflect the updated attributes.
  • D. They don't; the tasks must be modified in the plan editor to affect the pla

Answer: A

NEW QUESTION 7
A user notices that work items in the release backlog are initially unordered. What must be done to update the ordering?

  • A. Move each work item to appropriate swimlane.
  • B. Set rank for each work item using drag and drop.
  • C. Set priority for each work item and click Reorder.
  • D. Promote or demote each work item using action men

Answer: C

NEW QUESTION 8
A user checks in changes and creates a baseline. The user later has doubts and wants to remove the baseline. How can this be achieved?

  • A. Baselines created are permanent and cannot be deleted.
  • B. A configuration manager can delete baselines in the component history.
  • C. The user reverts the baseline which deletes it from the outgoing changes.
  • D. The user can get rid of the baselines by replacing the components with an earlier baselin

Answer: B

NEW QUESTION 9
Management is asking for report describing all RTC users, team areas, team members and corresponding process roles, as well as team area administrators for an RTC project area.
How should the report be created?

  • A. Generate Runtime Report using the RTC Eclipse client.
  • B. Use the "repotools-jts" utility with the "exportUsers" option.
  • C. Export users from the Team Organization View in the RTC Eclipse client.
  • D. Export the users from the "Active Users" menu on the JTS Application Administration Web Pag

Answer: D

NEW QUESTION 10
A developer working in the RTC Eclipse client has changed several files in the loaded workspace and checked them in. The developer then suspends the changes.
What is the result?

  • A. The change set is discarded and the changes permanently removed.
  • B. The change set is removed from the workspace, but preserved in the repository.
  • C. The change set remains in the Outgoing folder but must be reactivated in order to work with it.
  • D. The change set is marked as complete and then flows to the current flow target of the workspac

Answer: C

NEW QUESTION 11
A project manager asks the administrator to restrict user access to the project area to only people on the project. Where would the administrator go in order to modify this?

  • A. Access Groups
  • B. Operational Behaviors
  • C. Team Area Permissions
  • D. Project Area Access Control

Answer: B

NEW QUESTION 12
A project manager determines the current iteration is complete and decides that the next iteration should be started. How is this done?

  • A. Set the current iteration's status to complete.
  • B. Set the next iteration as the current iteration.
  • C. Specify that a release is scheduled with the next iteration
  • D. The start and end dates will automatically start the next iteration.

Answer: B

NEW QUESTION 13
A project manager wants to create an effective project dashboard and is planning the content. Which points should be considered? (Choose three.)

  • A. Determine the goals for the dashboard.
  • B. Consider creating a project plan dashboard.
  • C. Determine how the dashboard addresses the goals.
  • D. Consider the layout and number of columns for the dashboard.
  • E. Determine whether to use a personal, project or team dashboard.
  • F. Choose reports to add to the dashboard that will display the appropriate metric

Answer: BEF

NEW QUESTION 14
A developer has created a repository workspace on the server and wants to be able to access the files locally via installed tools such as editors and compilers.
What action must the developer take to accomplish this?

  • A. Take a baseline of the components.
  • B. Load the contents of the repository workspace.
  • C. Check out the files and save copies to the file system.
  • D. Modify the stream's flow target to match the repository workspac

Answer: A

NEW QUESTION 15
How does RTC support agile planning?

  • A. RTC support work item based configurable agile planning using time tracking, Gantt charts, and out of the box custom reports.
  • B. RTC supports sprint planning with configurable plan types and plan views, an agile scheduler, complexity management, and ranking.
  • C. RTC supports agile planning by importing and exporting plans to Microsoft Project to calculate sprint planning and user allocation to tasks.
  • D. RTC supports work item based agile cross project planning including predecessor/successor linking, prioritization and critical path analysis.

Answer: A

NEW QUESTION 16
A developer is working on source code changes and would like to test them using an existing build definition. The developer, however, does not want the testing to impact the overall build definition status or notify subscribers. How can this be accomplished?

  • A. Request a personal build.
  • B. Restart the build engine in test mode.
  • C. Set the build result's type to Private.
  • D. Define a pruning policy on the build definitio

Answer: A

NEW QUESTION 17
A user would like to set up mandatory attributes. How can this be accomplished?

  • A. Set a work item precondition.
  • B. Update the work item type's workflow.
  • C. Update the permissions for a specific role.
  • D. Change a setting on the attribute definitio

Answer: A

NEW QUESTION 18
An administrator wants to create a new plan view that shows the parent-child relationships of work items. Which plan view display allows this?

  • A. flat
  • B. tree
  • C. kanban
  • D. taskboard

Answer: A

NEW QUESTION 19
An RTC administrator has installed JTS and CCM using a departmental server topology and completed the Jazz Team Server and Application Setup process.
How many Public URIs (context root) exist for this topology?

  • A. Zero
  • B. 1 for JTS
  • C. 1 for CCM
  • D. 1 for JTS and 1 for CCM

Answer: C

NEW QUESTION 20
An organization plans to have a large number of project areas. The process engineering team plans to Change roles as well as the associated permissions. The organization does not allow changes to a project area process directly on the production system and needs to minimize the work to deploy a new process to all the project areas.
How can this be accomplished?

  • A. Use Process Sharing.
  • B. Extract the Process Templates.
  • C. Export and import the Process Templates.
  • D. Copy process XML to each production project are

Answer: B

NEW QUESTION 21
Management has requested that two RTC evaluation servers and two RTC departmental servers be deployed. Each RTC server will have a firewall blocking access to jazz.net and requires different installation packages.
What is the correct installation option?

  • A. use the Web Installer
  • B. use Enterprise Platform Installer
  • C. use IBM Installation Manager Repositories
  • D. use plain .zip files for the JTS and CCM Application

Answer: C

NEW QUESTION 22
A user wants a query to filter work items in the closed group of a workflow. Which option in the query condition allows this?

  • A. Resolved
  • B. Unassigned
  • C. Unresolved
  • D. Current Iteration

Answer: C